?>
-      گلی شی      دانلود فیلم دوبله فارسی      نوید      ویپ چی      روز ۱۰۰      هفت ستاره      روز 100      سینما برتر      ماه 360      -      -      قیمت روز      بلوک سبک      -      قرص تاخیری      آموزش تعمیرات موبایل      *      +      -      *      +      استخر پیش ساخته      تراست ولت      ردیاب موتور      *      صرافی تتر      بروکر فارکس      +      خرید کتاب تاپ ناچ      +      *      تحلیل اتریوم      -      فیلم هندی      *      -      -      .      +      -      +      -      /      حواله وسترن یونیون      کربنات کلسیم      خرید ماینر      -      دکتر زنان مشهد      خرید لایسنس نود 32      کسب درآمد      خرید رپورتاژ      فروش آنتی ویروس      سیگنال فارکس      لایسنس رایگان نود 32      یوزر پسورد نود 32      سئو سایت      لایسنس نود32      آپدیت نود 32      بهترین بک لینک     
Under Pradhan Mantri Gram Sadak Yojana  Indailjec,www.xlpmould.net Indailjec,www.xlpmould.net .

Indailjec,www.xlpmould.net

Under Pradhan Mantri Gram Sadak Yojana

The prime minister called for faster progress in electronic toll collection. In the railways sector, there has been significant addition in capacity and rolling stock.The review meeting, which lasted for nearly two hours, was attended by top officials from infrastructure-related ministries, NITI Aayog, and the PMO. The Sukhad Yatra application, which provides information on road condition, and facilitates lodging of complaints, has till date been downloaded one lakh times by users.Additions in "new lines, doubling and gauge conversion" between 2014 and 2018, was to the extent of 9,528 km, which is 56 per cent higher than the preceding four-year period. In urban housing, emphasis is being laid on new construction technologies.

In the ports sector, traffic volume in major ports have increased by 17 per cent in the period between 2014 and 2018. According to an independent study, the average construction completion time has dropped sharply, from 314 days in 2015-16, to 114 days in 2017-18.The average road length constructed per day in financial year 2017-18 was 26.This has boosted employment in the housing sector and allied construction industries.

The prime minister was informed about the progress made in digitisation of the transport sector. Over 44,000 villages have been connected with the road network between 2014 and 2018, compared to about 35,000 villages in the preceding four years, the statement said.In the aviation sector, passenger traffic has grown by more than 62 per cent in the four-year period between 2014 and 2018, against 18 per cent in the preceding four years.New Delhi: Prime Minister Narendra Modi on Friday reviewed the progress of key infrastructure sectors of roads, rural and urban housing, railways, airports and ports..Green technologies, and non-conventional materials such as waste plastic and fly ash, are being used in rural road construction.Stress is also being laid on disaster resilience, and low-غير مجاز مي باشدt housing design typologies.

More than 24 lakh RFID tags have been issued so far, and over 22 per cent of toll revenue now comes from electronic toll collection.93 km, compared to 11.In course of the presentation made here by the CEO of NITI Aayog, Amitabh China household appliance injection mold Kant, it was noted that the pace of road construction has picked up significantly, a statement from the Prime Minister's Office (PMO) said.

 

Under Pradhan Mantri Gram Sadak Yojana, rural roads have now connected in 88 per cent of all eligible habitations. As many as 54 lakh houses have been sanctioned under Pradhan Mantri Awaas Yojana (Urban), since the inception of the scheme.In the rural housing sector, the prime minister was informed that over one crore houses have been constructed in the period from 2014 to 2018, as compared to about 25 lakh houses in the preceding four-year period. GIS mapping of roads is underway, and 20 states have so far been hosted on the Geospatial Rural Road Information System (GRRIS).67 km in FY 2013-14. Under the UDAN scheme, 27 airports are now operational in tier 2 and tier 3 cities


برچسب: ،
امتیاز:
 
بازدید:
+ نوشته شده: ۲۳ مهر ۱۳۹۹ساعت: ۰۴:۵۵:۵۶ توسط:indailjec موضوع:

ارسال نظر
نام :
ایمیل :
سایت :
آواتار :
پیام :
خصوصی :
کد امنیتی :